Our TRIANGLE E-W PRO can be installed in East-West orientation without a penetration of the roof and a minimum use of ballast. The TRIANGLE E-W PRO is available in 10 or 15 degree to allow a layout optimisation either in regards to maximum output or maximum number of modules.

  • Ballast profile
  • Central support
  • End clamp Assy
  • Front foot
  • Ground rails
  • Mid clamp assy
  • Strut triangles
  • T head bolt and nut
Product BrochureDownload
Installation ManualDownload